| Item | Detail |
|---|---|
| Purpose | Bridge loan (crowd lending) to SYMA ITALIA to develop the RYBNIK project, specifically for the connection estimates necessary for the relative procedure |
| 4% Rate | 4% gross annual for invested amounts between €0 and €100,000 |
| 3.5% Rate | 3.5% gross annual for invested amounts between €100,000 and €200,000 |
| 3% Rate | 3% gross annual for invested amounts between €200,000 and €440,000 |
| Amortization | Bullet: interest-only installments, with principal repaid at the end of the 24 months |
| Installments | Quarterly |
| Duration | 24 months |
| CONDITIONAL BONUS* | 18% overall gross annual, if any of conditions a), b) or c) occurs |
| • Condition a | The SPV holding the project is sold to third parties, even after the 24 months |
| • Condition b | Construction of the project begins, by SYMA group companies or third parties |
| • Condition c | If by the close of the 2031 financial year neither a) nor b) occurs, additional interest up to the bonus amount, owed only if SYMA Polska sp. z o.o. achieves a net profit exceeding €350,000 (the excess goes to investors) |
| Guarantee c | Requires an Autonomous Commitment Deed from SYMA Polska and sending the approved balance sheet to ENER2CROWD within 30 days of approval. Without the deed, guarantee c does not apply |
| Profit History | Positive net profit every financial year since 2022: €173,000, €118,000, €489,000, €274,000 (total over €1,000,000) |
+18% BONUS - CONDITIONAL RETURN*
HOW DOES IT WORK?
The campaign has a duration of 24 months with "bullet" amortization (interest-only installments with principal in the last installment) - upon the occurrence of the conditions listed above, SYMA ITALIA S.r.l. until 2031 (beyond the 24-month maturity) will have the option to allocate an additional bonus of 18%* to the campaign investors as recognition for the support provided thanks to the fundraising and the success of the project.
(Please note that the bonus is subject to the conditions listed above)
THE RYBNIK BESS PROJECT
Syma Italia S.r.l. - a company operating in the renewable energy sector in both Italy and Europe - is developing a project for the construction of a BESS electrochemical storage system in Poland with a nominal power of 60 MW (240.72 MWh of energy capacity, 4-hour duration) through a dedicated SPV, featuring an integrated 300 kWp photovoltaic component, capable of drawing energy from the grid, storing it, and subsequently reinjecting it into the Polish electrical system according to market and grid requirements.
The technical solution identified by PSE S.A., the operator of the Polish national transmission grid, involves connecting the plant via a direct 110 kV connection to the Wielopole GPZ Station (400/220/110/27/15 kV), located in Wielopole, in the municipality of Rybnik (Silesia). The site, of approximately 1.44 ha on cadastral parcels Dz. 2816 + 2914, is adjacent to the planned connection point, which simplifies the scope of work and minimizes infrastructure connection costs; furthermore, its proximity to Elektrownia Rybnik ensures a particularly robust grid infrastructure.
Syma submitted the connection application on April 29, 2026, the last useful working day to access the legacy tariff regime (30 PLN/kW), a time advantage that few other projects in Poland managed to secure before the entry into force of the new grid connection regulations. The Grid Connection Conditions (GCC) are expected no later than the first quarter of 2027, with a deposit top-up to 60 PLN/kW to be paid within 30 days of the decision; The GCC will remain valid for one year, during which the grid connection agreement must be signed. Achieving "Ready-to-Build" status is scheduled by the end of 2027.
The BESS facility, based on 68 Sungrow ST5015UX-4H units with LiFePO4 (Li-ion) chemistry, is designed to provide flexibility to the Polish electrical system, participating in the Capacity Market, aFRR/mFRR balancing services (±15 MW/min ramp rate), and day-ahead and intraday market arbitrage, with an estimated annual delivery capacity of up to 158 GWh. By storing energy during periods of highest availability and returning it during peak demand moments, the Rybnik project will contribute to the stability, security, and efficiency of the Polish national electricity system, in a market context where Poland estimates a storage requirement of 5-10 GW by 2030.
project render
The development process of a BESS project in Poland, as applied to the Rybnik project, is summarised below:
BESS projects in Poland may be developed on a stand-alone basis or in hybrid configuration with photovoltaic or wind power plants, as in the case of Rybnik. The Polish regulatory framework does not currently provide direct generation incentives, but allows participation in markets regulated by the transmission system operator PSE S.A. and in the Capacity Market, as well as access to competitive grant programmes such as those managed by NFOŚiGW (National Fund for Environmental Protection and Water Management).
| Item | Detail |
|---|---|
| Purpose | Bridge loan (crowd lending) to SYMA ITALIA to develop the RYBNIK project - specifically for the connection estimates necessary for the relative procedure |
| 4% Rate | 4% gross annual for invested amounts between €0 and €100,000 |
| 3.5% Rate | 3.5% gross annual for invested amounts between €100,000 and €200,000 |
| 3% Rate | 3% gross annual for invested amounts between €200,000 and €440,000 |
| Amortization | Bullet: interest-only installments, with principal repaid at the end of the 24 months |
| Installments | Quarterly |
| Duration | 24 months |
| CONDITIONAL BONUS | 18% overall gross annual, if any of conditions a), b) or c) occurs |
| • Condition a | The SPV holding the project is sold to third parties, even after the 24 months |
| • Condition b | Construction of the project begins, by SYMA group companies or third parties |
| • Condition c | If by the close of the 2031 financial year neither a) nor b) occurs, additional interest up to the bonus amount, owed only if SYMA Polska sp. z o.o. achieves a net profit exceeding €350,000 (the excess goes to investors) |
| Guarantee c | Requires an Autonomous Commitment Deed from SYMA Polska and sending the approved balance sheet to ENER2CROWD within 30 days of approval. Without the deed, guarantee c does not apply |
| Profit History | Positive net profit every financial year since 2022: €173,000, €118,000, €489,000, €274,000 (total over €1,000,000) |
Battery Energy Storage Systems (BESS) are devices designed to store electrical energy efficiently, using advanced technologies that allow the storage of energy produced, for example, by photovoltaic and/or renewable power plants, and release it when needed. These systems are fundamental for optimizing the distribution of renewable energy, improving the reliability and stability of energy grids, especially in contexts where production is intermittent, as in the case of solar and wind energy. BESS consist of high-capacity battery modules that can be scaled according to specific needs. The stored energy can be used to compensate for peak demand or to support electrical grids during periods of low production, ensuring a continuous and balanced supply. Furthermore, BESS systems help reduce the need for fossil fuel plants, thereby cutting CO2 emissions and facilitating the transition to a sustainable energy mix. From a financial perspective, BESS offer significant advantages as they allow for the maximization of the use of generated energy, the reduction of operational costs, and the optimization of energy flow management. In many jurisdictions, the installation of storage systems is incentivized thanks to support policies that promote the adoption of innovative and sustainable energy solutions. Estimates indicate rapid growth for BESS systems in the coming years. In 2022, the global market recorded an installed storage capacity of approximately 15 GW, with annual growth forecasts exceeding 20%, leading the total to exceed 60 GW by 2030. This development will contribute significantly to the decarbonization of global electrical grids, making the energy system more resilient, efficient, and low-impact.
Investing in BESS therefore represents a strategic choice not only to improve energy management efficiency, but also to foster a sustainable energy future, reducing dependence on fossil fuels and contributing to the fight against climate change.
The BESS facility subject to the fundraising campaign, developed by SYMA ITALIA S.R.L. through a dedicated SPV, will be built in the vicinity of Rybnik in Poland.
| Company name | Syma Italia S.r.l. |
|---|---|
| VAT number | 04377040243 |
| Date of incorporation | 19 December 2021 |
| Registered office | Via Vecchia Ferriera 18/22, Vicenza (36100, VI) |
| Legal form | Limited liability company |
| Relevant shareholders | Marco Ferrara |
| Main activity (ATECO) | 70.10 - activities of head offices (holding companies) |
| LEI (Legal Entity Identifier) | 984500BI19C844773B80 |
THE SYMA GROUP
SYMA Group is an independent renewable energy project developer, founded in 2017 with the aim of transforming land and project ideas into authorised, financeable and construction-ready assets. The group creates value by acquiring and developing the rights required to implement investments — in particular construction rights and grid connection conditions — managing the entire development cycle of photovoltaic, wind and energy storage projects (BESS), from the greenfield stage through to Ready-to-Build status. Once this level of maturity is reached, the assets are sold at different stages of development, generating returns that are reinvested to support the continued growth of the pipeline.
Today, SYMA operates in three countries — Poland, Italy and Romania — with a team of approximately 25 professionals and an overall pipeline exceeding 5.3 GW across photovoltaic, wind and energy storage projects. The group comprises more than 70 special purpose vehicles and relies on a proprietary digital platform to manage project development, permitting and investment monitoring in real time. Since its foundation, the company has remained consistently profitable, regularly distributes dividends and maintains a solid financial position, with no outstanding bank exposure — an element that reflects the financial discipline underpinning its growth model.
The group is led by its two co-founders, Sylwia H. Bernaś, President, and Marco Ferrara, CEO. Sylwia brings more than twenty years of entrepreneurial experience between Italy and Poland and is responsible for corporate strategy and stakeholder relations, having contributed to building an organisation operating across three countries. Marco, with a background in management engineering and more than twenty years of experience in the energy sector — including serving as CEO of a company included in the Financial Times FT1000 ranking, sixth in Europe and first in Italy in the energy category — has played a key role in building the 5.3 GW pipeline and establishing joint ventures with major listed energy groups and state-owned companies. They are supported by a team of specialist partners covering engineering, business development, finance and legal matters, including Michał Krzak (COO), Michal Janiszewski (CFO) and several other professionals forming a solid and multidisciplinary organisation.
SYMA's growth path clearly illustrates the group's trajectory. Following its foundation in 2017 and its first commercial partnerships, in 2019 the company formally entered the renewable energy sector by launching its first photovoltaic projects in Poland. The year 2020 represented an important turning point, with the signing of a joint development agreement with a major international energy group and the entry of new shareholders. The following year marked the beginning of international expansion, with the launch of a 1 GW pipeline in Romania in cooperation with a state-owned energy company. In 2022, the group consolidated its results by reaching a significant milestone in revenues from project sales and signing a new 250 MW joint development agreement in Italy. In 2023, SYMA launched an in-house engineering company and exceeded 130 MW of secured grid connections. The year 2024 marked another major step forward: the pipeline exceeded 5.3 GW, a significant project sale to a major international energy group was completed, a new energy storage partnership was launched and SYMA entered the TOP 10% of companies recognised in Poland's "Effective Companies 2024" ranking. In 2025, the group reached full financial maturity, securing grid connections for 350 MW of BESS projects, while 2026 opened with new investor partnerships and the objective of achieving further scalability across European markets.
SYMA's business model is structured around four mutually reinforcing areas. The first is renewable project development on behalf of strategic partners, through long-term development agreements based on milestone payments, covering the entire process from land acquisition through to Ready-to-Build status. The second is the sale of proprietary projects and assets, developed internally and sold at different stages of maturity, from greenfield to fully construction-ready. The third is transactional and operational advisory, through which SYMA supports third-party partners in M&A processes, technical due diligence and entry into new markets, with the long-term objective of building an integrated platform of expertise also through the acquisition of engineering and O&M companies. The fourth, more strategic area is energy generation and sales under an Independent Power Producer model: SYMA intends to selectively retain stakes in some of its most promising projects, developing PPA agreements capable of generating stable long-term revenue streams alongside the continuous sale of mature assets.
A distinctive feature of the group is the combination of the Polish and Italian markets. Poland, a country undergoing a major energy transition, is currently one of Europe's most promising and dynamic markets for renewable energy development; Italy, with its solid industrial and financial ecosystem, offers access to international capital and established expertise. Combining these two markets — together with the group's presence in Romania — enables SYMA to build a diversified portfolio by geography, technology and stage of development, reducing overall risk and supporting operational resilience even in evolving market conditions. It is therefore significant that the group's headquarters are located in Wrocław, one of Central Europe's leading technology and business centres, reflecting both the Polish-Italian roots of the founders and the city's strategic position at the heart of the continent.
For investors considering a potential collaboration, SYMA offers a structured and transparent process: an initial contact with the investor relations team, followed by the execution of a confidentiality agreement and access to detailed investment materials, before proceeding with due diligence, negotiation of the terms and definition of the transaction structure — with direct access to management throughout each stage of the process.
The Loan Agreement is a purpose loan: ... Register or login to find out all the details!
The total connection cost for the photovoltaic system is € 1.374.436,73 (including VAT). To proceed with the procedures, it was necessary to pay Enel approximately ~ 30%, therefore € 412.331 (including VAT).
The collection on Ener2Crowd will allow to refinance this amount, in order to continue with the authorization procedures and the development of new projects in Italy.
Since November 2023, the sector has been governed by the ECSP (European Crowdfunding Service Providers Regulation), which introduced a uniform regulatory framework at the EU level, strengthening transparency standards, risk assessment procedures, and protections for the benefit of investors.
The Relevant Parties, except for the Conflict of Interest Policy Manager and the Crowdfunding Service Provider, who cannot under any circumstances participate in the Crowdfunding Offerings published on the Platform, are authorized to invest in this Crowdfunding Offering on equal terms with all other Investors and without preferential treatment or privileged access to information.
For more information, please consult the policy at the following link
• SDG 9 implements resilient structures and infrastructures;
• SDG 11 improvement of energy efficiency and strengthening of communities;
• SDG 12 responsible and efficient consumption of available resources;
• SDG 13 action against and mitigation of climate change with related reduction of GHGs.
Become a protagonist of the future and sustainable development by financing this initiative!
Battery Energy Storage Systems (BESS) are devices designed to store electrical energy efficiently, using advanced technologies that allow the storage of energy produced, for example, by photovoltaic and/or renewable power plants, and release it when needed. These systems are fundamental for optimizing the distribution of renewable energy, improving the reliability and stability of energy grids, especially in contexts where production is intermittent, as in the case of solar and wind energy. BESS consist of high-capacity battery modules that can be scaled according to specific needs. The stored energy can be used to compensate for peak demand or to support electrical grids during periods of low production, ensuring a continuous and balanced supply. Furthermore, BESS systems help reduce the need for fossil fuel plants, thereby cutting CO2 emissions and facilitating the transition to a sustainable energy mix. From a financial perspective, BESS offer significant advantages as they allow for the maximization of the use of generated energy, the reduction of operational costs, and the optimization of energy flow management. In many jurisdictions, the installation of storage systems is incentivized thanks to support policies that promote the adoption of innovative and sustainable energy solutions. Estimates indicate rapid growth for BESS systems in the coming years. In 2022, the global market recorded an installed storage capacity of approximately 15 GW, with annual growth forecasts exceeding 20%, leading the total to exceed 60 GW by 2030. This development will contribute significantly to the decarbonization of global electrical grids, making the energy system more resilient, efficient, and low-impact.
Investing in BESS therefore represents a strategic choice not only to improve energy management efficiency, but also to foster a sustainable energy future, reducing dependence on fossil fuels and contributing to the fight against climate change.
BESS systems do not generate directly clean energy, but enhance the effectiveness of existing renewable sources and reduce reliance on fossil fuels, accelerating the energy transition.