Summary
  • Days left
    0
  • Annual return
    7,40%
  • Investment duration
    36 MONTHS
  • Investors
    399
  • Min/Max investment
    100 / 500.000€
  • Project type:
    RENEWABLE SOURCES
  • Minimum raised target
    350.000 €
  • Maximum raised target:
    500.000 €
  • Basic annual rate of return:
    7,40%
  • Investment duration:
    36 MONTHS
  • Type of amortization:
    Fixed installment (French-style amortization: capital + interest at each installment)
    For more details, see the section "FINANCIAL DATA"
  • First instalment repayment date:
    2023-07-31
  • Last repayment date:
    2026-04-30


what am i going to invest in?

The company DC ENERGY requests a loan of €350,000 (with a maximum of €500,000) for the construction of a wind farm from 500kWp in the Province of Foggia (FG).

The plant is part of a 2 MW project, 1 MW of which is already in operation. Estimated production of the wind farm is 1,500,000 kWh of electricity each year, thus generating a significant production capacity and influencing environmental protection, reducing impacts on the ecosystem.

how is the investment paid back?

The wind system benefits from FER 2019 incentive fee with energy sales equal to 140€/MWh.

The energy produced by the plant will be sold for the first months, up to a maximum of 18 months from the date of connection to the grid, through grid-parity – or on the prices attested on the free energy market, currently greater than the incentive tariff. At the end of the period the energy will be sold with incentive GSE FER registry for 140€ to MWh.

JOIN US