Summary
  • Days left
    39
  • Base rate until
    4,00%
  • Investment duration
    24 MONTHS
  • Investors
    8
  • Min/Max investment
    300 / 100.000€
  • Project type:
    RENEWABLE SOURCES
  • Minimum raised target
    100.000 €
  • Maximum raised target:
    440.000 €
  • Basic annual rate of return:
    4.00%
    3.50%
    3.00%
  • Investment duration:
    24 MONTHS
  • Type of amortization:
    Bullet amortization Periodic repayment of interest and capital only at’last installment.
    For more details, see the section "FINANCIAL DATA"
  • First instalment repayment date:
    2027-04-30
  • Last repayment date:
    2027-12-31


+18% BONUS (CONDITIONAL YIELD)*


SYMA is willing to provide a conditional bonus of an overall gross annual 18% in the event that the following conditions listed below occur: 

a) the SPV holding the Project is sold to third parties, even if the sale takes place after the 24-month financing period referred to in the point;

or

b) the construction of the Project begins, regardless of whether it is carried out by SYMA group companies or by third parties;

or

c) if, by the closing of the 2031 financial year, neither of the two events indicated in letters a) and b) above has occurred, the PROJECT OWNER nevertheless undertakes to pay the Investors, as a further protection measure, an additional interest up to the amount of the Conditional Return, under the following conditions:

• (i) such additional interest is due and will be paid exclusively to the extent and within the limits that SYMA Polska sp. z o.o. achieves, in one or more financial years up to the 2031 financial year, a net profit exceeding Euro 350,000.00, in which case the excess over this threshold will be allocated, up to the amount of the Conditional Return, to the payment of Investors according to the methods and timing specified in the individual Financing Agreement; in this regard, it should be noted that SYMA Polska sp. z o.o. has generated a positive net profit in each financial year since 2022 (respectively Euro 173,000, Euro 118,000, Euro 489,000 and Euro 274,000, for a total exceeding Euro 1,000,000);
• (ii) this protection mechanism is in any case conditional upon the signing, concurrently with this Agreement, of a separate and specific Autonomous Commitment Deed with which SYMA Polska sp. z o.o. irrevocably and directly undertakes, towards ENER2CROWD and the Investors, to allocate the net profit excess referred to in point (i) to the payment of the Conditional Return, as well as to transmit to ENER2CROWD, within thirty days of the approval of each financial year's balance sheet, a copy of the approved balance sheet or other suitable accounting documentation, for the purpose of verifying the exceeding of the threshold referred to in point (i);
• (iii) in the absence of the signing of the Autonomous Commitment Deed referred to in point (ii) above, the guarantee referred to in this letter c) shall not apply, without prejudice to the provisions of letters a) and b) above.

HOW DOES IT WORK? 
The campaign has a duration of 24 months with "bullet" amortization (interest-only installments with principal in the last installment) - upon the occurrence of the conditions listed above, SYMA ITALIA S.r.l. until 2031 (beyond the 24-month maturity) will have the option to allocate an additional bonus of 18%* to the campaign investors as recognition for the support provided thanks to the fundraising and the success of the project. 

(Please note that the bonus is subject to the conditions listed above)

THE PROJECT

THE RYBNIK BESS PROJECT

Syma Italia S.r.l. - a company operating in the renewable energy sector in both Italy and Europe - is developing a project for the construction of a BESS electrochemical storage system in Poland with a nominal power of 60 MW (240.72 MWh of energy capacity, 4-hour duration) through a dedicated SPV, featuring an integrated 300 kWp photovoltaic component, capable of drawing energy from the grid, storing it, and subsequently reinjecting it into the Polish electrical system according to market and grid requirements.

The technical solution identified by PSE S.A., the operator of the Polish national transmission grid, involves connecting the plant via a direct 110 kV connection to the Wielopole GPZ Station (400/220/110/27/15 kV), located in Wielopole, in the municipality of Rybnik (Silesia). The site, of approximately 1.44 ha on cadastral parcels Dz. 2816 + 2914, is adjacent to the planned connection point, which simplifies the scope of work and minimizes infrastructure connection costs; furthermore, its proximity to Elektrownia Rybnik ensures a particularly robust grid infrastructure.

Syma submitted the connection application on April 29, 2026, the last useful working day to access the legacy tariff regime (30 PLN/kW), a time advantage that few other projects in Poland managed to secure before the entry into force of the new grid connection regulations. The Grid Connection Conditions (GCC) are expected no later than the first quarter of 2027, with a deposit top-up to 60 PLN/kW to be paid within 30 days of the decision; The GCC will remain valid for one year, during which the grid connection agreement must be signed. Achieving "Ready-to-Build" status is scheduled by the end of 2027.

The BESS facility, based on 68 Sungrow ST5015UX-4H units with LiFePO4 (Li-ion) chemistry, is designed to provide flexibility to the Polish electrical system, participating in the Capacity Market, aFRR/mFRR balancing services (±15 MW/min ramp rate), and day-ahead and intraday market arbitrage, with an estimated annual delivery capacity of up to 158 GWh. By storing energy during periods of highest availability and returning it during peak demand moments, the Rybnik project will contribute to the stability, security, and efficiency of the Polish national electricity system, in a market context where Poland estimates a storage requirement of 5-10 GW by 2030.

project render

HOW TO DEVELOP A BESS PROJECT

The development process of a BESS project in Poland, as applied to the Rybnik project, is summarised below:

  • Preliminary analysis: selection of the site in proximity to existing electrical substations — in the case of Rybnik, directly adjacent to the Wielopole GPZ (400/220/110 kV) — and assessment of the project's technical and economic feasibility, including the acquisition or lease of the relevant land plots.
  • Grid connection application: submission of the application to the national transmission system operator PSE S.A., together with payment of the grid connection deposit (PLN 30/kW) and the non-refundable fee (PLN 1/kW); the operator subsequently verifies the completeness of the application.
  • Environmental and planning permits: obtaining the environmental decision (EIA/DŚU) and the planning decision (MPZP/WZ, local zoning plan or development conditions), required in order to proceed with the development of the site.
  • Grid Connection Conditions (GCC): issuance by PSE of the warunki przyłączenia, which define the technical parameters of the connection and trigger the top-up of the deposit (up to PLN 60/kW).
  • Grid connection agreement: execution of the connection agreement with PSE, with payment of the final security deposit within 14 days of signing.
  • Building permit: issuance of the construction permit, a necessary condition for achieving Ready-to-Build status, at which point the project becomes fully financeable and transferable to a long-term owner.
  • Construction and commissioning: appointment of the EPC contractor, installation of the BESS units (in the case of Rybnik, Sungrow modules using LiFePO4 chemistry), execution of electrical and civil works, functional testing and commissioning.
  • Operational management: participation in regulated markets — Capacity Market, aFRR/mFRR balancing services, day-ahead and intraday arbitrage — together with continuous monitoring and maintenance of the facility.

BESS projects in Poland may be developed on a stand-alone basis or in hybrid configuration with photovoltaic or wind power plants, as in the case of Rybnik. The Polish regulatory framework does not currently provide direct generation incentives, but allows participation in markets regulated by the transmission system operator PSE S.A. and in the Capacity Market, as well as access to competitive grant programmes such as those managed by NFOŚiGW (National Fund for Environmental Protection and Water Management).

THE LENDING CROWDFUNDING OPERATION

This crowd lending campaign is a bridge loan useful for SYMA to develop the RYBNIK project - with particular reference to the connection estimates necessary to proceed with the relevant procedure - and is structured as follows: 

• Gross annual interest rate 4% for invested amount between €0 and €100,000

•
Gross annual interest rate 3.5% for invested amount between €100,000 and €200,000
•
Gross annual interest rate 3% for invested amount from €200,000 to €440,000

The campaign provides for a bullet type amortization (interest-only installments and principal at the end) with quarterly installments for a duration of 24 months. 


BONUS - CONDITIONAL RETURN 18%

SYMA is willing to provide a conditional bonus of an overall 18% gross annual rate in the event that the following conditions listed below occur: 

a) the SPV holding the Project is sold to third parties, even if the sale takes place after the 24-month financing period referred to in the point;

or

b) the construction of the Project begins, regardless of whether it is carried out by SYMA group companies or by third parties;

or

c) if, by the closing of the 2031 financial year, neither of the two events indicated in letters a) and b) above has occurred, the PROJECT OWNER nevertheless undertakes to pay the Investors, as a further protection measure, an additional interest up to the amount of the Conditional Return, under the following conditions:

• (i) such additional interest is due and will be paid exclusively to the extent and within the limits that SYMA Polska sp. z o.o. achieves, in one or more financial years up to the 2031 financial year, a net profit exceeding Euro 350,000.00, in which case the excess over this threshold will be allocated, up to the amount ofلاع the Conditional Return, to the payment of Investors according to the methods and timing specified in the individual Financing Agreement; in this regard, it should be noted that SYMA Polska sp. z o.o. has generated a positive net profit in each financial year since 2022 (respectively Euro 173,000, Euro 118,000, Euro 489,000 and Euro 274,000, for a total exceeding Euro 1,000,000);
• (ii) this protection mechanism is in any case conditional upon the signing, concurrently with this Agreement, of a separate and specific Autonomous Commitment Deed with which SYMA Polska sp. z o.o. irrevocably and directly undertakes, towards ENER2CROWD and the Investors, to allocate the net profit excess referred to in point (i) to the payment of the Conditional Return, as well as to transmit to ENER2CROWD, within thirty days of the approval of each financial year's balance sheet, a copy of the approved balance sheet or other suitable accounting documentation, for the purpose of verifying the exceeding of the threshold referred to in point (i);
• (iii) in the absence of the signing of the Autonomous Commitment Deed referred to in point (ii) above, the guarantee referred to in this letter c) shall not apply, without prejudice to the provisions of letters a) and b) above.

BESS - Battery Energy Storage System

Battery Energy Storage Systems (BESS) are devices designed to store electrical energy efficiently, using advanced technologies that allow the storage of energy produced, for example, by photovoltaic and/or renewable power plants, and release it when needed. These systems are fundamental for optimizing the distribution of renewable energy, improving the reliability and stability of energy grids, especially in contexts where production is intermittent, as in the case of solar and wind energy. BESS consist of high-capacity battery modules that can be scaled according to specific needs. The stored energy can be used to compensate for peak demand or to support electrical grids during periods of low production, ensuring a continuous and balanced supply. Furthermore, BESS systems help reduce the need for fossil fuel plants, thereby cutting CO2 emissions and facilitating the transition to a sustainable energy mix. From a financial perspective, BESS offer significant advantages as they allow for the maximization of the use of generated energy, the reduction of operational costs, and the optimization of energy flow management. In many jurisdictions, the installation of storage systems is incentivized thanks to support policies that promote the adoption of innovative and sustainable energy solutions. Estimates indicate rapid growth for BESS systems in the coming years. In 2022, the global market recorded an installed storage capacity of approximately 15 GW, with annual growth forecasts exceeding 20%, leading the total to exceed 60 GW by 2030. This development will contribute significantly to the decarbonization of global electrical grids, making the energy system more resilient, efficient, and low-impact.

Investing in BESS therefore represents a strategic choice not only to improve energy management efficiency, but also to foster a sustainable energy future, reducing dependence on fossil fuels and contributing to the fight against climate change.

QUALITATIVE EXAMINATION

Content available only for registered users. Log in or create an account to view all financial and corporate information.


Content available only for registered users. Log in or create an account to view all economic and corporate information.

THE PLACE OF THE INTERVENTION

The BESS facility subject to the fundraising campaign, developed by SYMA ITALIA S.R.L. through a dedicated SPV, will be built in the vicinity of Rybnik in Poland.  


SYMA ITALIA S.R.L.


Company nameSyma Italia S.r.l.
VAT number04377040243
Date of incorporation19 December 2021
Registered officeVia Vecchia Ferriera 18/22, Vicenza (36100, VI)
Legal formLimited liability company
Relevant shareholdersMarco Ferrara
Main activity (ATECO)70.10 - activities of head offices (holding companies)
LEI (Legal Entity Identifier)984500BI19C844773B80

THE SYMA GROUP

SYMA Group is an independent renewable energy project developer, founded in 2017 with the aim of transforming land and project ideas into authorised, financeable and construction-ready assets. The group creates value by acquiring and developing the rights required to implement investments — in particular construction rights and grid connection conditions — managing the entire development cycle of photovoltaic, wind and energy storage projects (BESS), from the greenfield stage through to Ready-to-Build status. Once this level of maturity is reached, the assets are sold at different stages of development, generating returns that are reinvested to support the continued growth of the pipeline.

Today, SYMA operates in three countries — Poland, Italy and Romania — with a team of approximately 25 professionals and an overall pipeline exceeding 5.3 GW across photovoltaic, wind and energy storage projects. The group comprises more than 70 special purpose vehicles and relies on a proprietary digital platform to manage project development, permitting and investment monitoring in real time. Since its foundation, the company has remained consistently profitable, regularly distributes dividends and maintains a solid financial position, with no outstanding bank exposure — an element that reflects the financial discipline underpinning its growth model.

The group is led by its two co-founders, Sylwia H. Bernaś, President, and Marco Ferrara, CEO. Sylwia brings more than twenty years of entrepreneurial experience between Italy and Poland and is responsible for corporate strategy and stakeholder relations, having contributed to building an organisation operating across three countries. Marco, with a background in management engineering and more than twenty years of experience in the energy sector — including serving as CEO of a company included in the Financial Times FT1000 ranking, sixth in Europe and first in Italy in the energy category — has played a key role in building the 5.3 GW pipeline and establishing joint ventures with major listed energy groups and state-owned companies. They are supported by a team of specialist partners covering engineering, business development, finance and legal matters, including Michał Krzak (COO), Michal Janiszewski (CFO) and several other professionals forming a solid and multidisciplinary organisation.

SYMA's growth path clearly illustrates the group's trajectory. Following its foundation in 2017 and its first commercial partnerships, in 2019 the company formally entered the renewable energy sector by launching its first photovoltaic projects in Poland. The year 2020 represented an important turning point, with the signing of a joint development agreement with a major international energy group and the entry of new shareholders. The following year marked the beginning of international expansion, with the launch of a 1 GW pipeline in Romania in cooperation with a state-owned energy company. In 2022, the group consolidated its results by reaching a significant milestone in revenues from project sales and signing a new 250 MW joint development agreement in Italy. In 2023, SYMA launched an in-house engineering company and exceeded 130 MW of secured grid connections. The year 2024 marked another major step forward: the pipeline exceeded 5.3 GW, a significant project sale to a major international energy group was completed, a new energy storage partnership was launched and SYMA entered the TOP 10% of companies recognised in Poland's "Effective Companies 2024" ranking. In 2025, the group reached full financial maturity, securing grid connections for 350 MW of BESS projects, while 2026 opened with new investor partnerships and the objective of achieving further scalability across European markets.

SYMA's business model is structured around four mutually reinforcing areas. The first is renewable project development on behalf of strategic partners, through long-term development agreements based on milestone payments, covering the entire process from land acquisition through to Ready-to-Build status. The second is the sale of proprietary projects and assets, developed internally and sold at different stages of maturity, from greenfield to fully construction-ready. The third is transactional and operational advisory, through which SYMA supports third-party partners in M&A processes, technical due diligence and entry into new markets, with the long-term objective of building an integrated platform of expertise also through the acquisition of engineering and O&M companies. The fourth, more strategic area is energy generation and sales under an Independent Power Producer model: SYMA intends to selectively retain stakes in some of its most promising projects, developing PPA agreements capable of generating stable long-term revenue streams alongside the continuous sale of mature assets.

A distinctive feature of the group is the combination of the Polish and Italian markets. Poland, a country undergoing a major energy transition, is currently one of Europe's most promising and dynamic markets for renewable energy development; Italy, with its solid industrial and financial ecosystem, offers access to international capital and established expertise. Combining these two markets — together with the group's presence in Romania — enables SYMA to build a diversified portfolio by geography, technology and stage of development, reducing overall risk and supporting operational resilience even in evolving market conditions. It is therefore significant that the group's headquarters are located in Wrocław, one of Central Europe's leading technology and business centres, reflecting both the Polish-Italian roots of the founders and the city's strategic position at the heart of the continent.

For investors considering a potential collaboration, SYMA offers a structured and transparent process: an initial contact with the investor relations team, followed by the execution of a confidentiality agreement and access to detailed investment materials, before proceeding with due diligence, negotiation of the terms and definition of the transaction structure — with direct access to management throughout each stage of the process.

CORPORATE STRUCTURE

The Loan Agreement is a purpose loan: ... Register or login to find out all the details!

COST STRUCTURE

The total connection cost for the photovoltaic system is € 1.374.436,73 (including VAT). To proceed with the procedures, it was necessary to pay Enel approximately ~ 30%, therefore € 412.331 (including VAT).

The collection on Ener2Crowd will allow to refinance this amount, in order to continue with the authorization procedures and the development of new projects in Italy.

AMORTIZATION PLAN

Content available only to registered users. Log in or create an account to view all financial and corporate information.

Crowdinvesting represents a form of crowdfunding aimed at raising capital for business initiatives. Through authorized digital platforms, investors can support corporate projects by obtaining, depending on the type of offer, a stake in the company's capital (equity) or a periodic return in the form of interest (lending).
It serves as an alternative and complementary financing channel to traditional credit, capable of facilitating access to capital for businesses and, at the same time, offering both retail and professional investors new opportunities for portfolio diversification and yield, making a concrete contribution to the development of the real economy.

As with any other form of investment, crowdinvesting involves potential risks. Before joining an offer, it is essential for the investor to carefully evaluate the risk profile associated with both the Project Owner and the presented project, thoughtfully analyzing all available information. Conscious risk-taking is a fundamental step in the decision-making process. It is therefore advisable to pre-assess one's risk appetite and become fully and transparently informed regarding the characteristics and uncertainties related to the investment.
Unlike traditional investment channels, crowdinvesting creates a direct link between businesses and investors, encouraging active participation in the growth of the entrepreneurial fabric and the development of funded projects. This direct, innovative, and disintermediated relationship, however, requires full awareness of the risks connected to the instrument.

Since November 2023, the sector has been governed by the ECSP (European Crowdfunding Service Providers Regulation), which introduced a uniform regulatory framework at the EU level, strengthening transparency standards, risk assessment procedures, and protections for the benefit of investors.

CONFLICTS OF INTEREST

The Relevant Parties, except for the Conflict of Interest Policy Manager and the Crowdfunding Service Provider, who cannot under any circumstances participate in the Crowdfunding Offerings published on the Platform, are authorized to invest in this Crowdfunding Offering on equal terms with all other Investors and without preferential treatment or privileged access to information.

For more information, please consult the policy at the following link

ENERGY STORAGE SYSTEM - BESS
Type "BESS" (Battery Energy Storage System)
Power 60.5 MW for both injection and withdrawal
GRID CONNECTION 110 kV, GPZ Wielopole
Permitting process Currently under technical, project development and permitting process
GRID OPERATOR PSE S.A.
APPLICATION HOLDER SYMA Polska → SunRen VII Sp. z o.o.
Location Rybnik – Poland

SDGs ACTIVATED BY THE PROJECT

fast






The SDGs - (Sustainable Development Goals) are 17 goals defined by the United Nations in the 2030 Agenda for Sustainable Development as a framework for a programmatic strategy "to achieve a better and more sustainable future for all" by 2030.
https://sdgs.un.org/goals
By financing this project you can contribute to supporting and implementing the following SDGs (Sustainable Development Goals):


Why these SDGs?

• SDG 9 implements resilient structures and infrastructures;
• SDG 11 improvement of energy efficiency and strengthening of communities;
• SDG 12 responsible and efficient consumption of available resources;
• SDG 13 action against and mitigation of climate change with related reduction of GHGs.

Become a protagonist of the future and sustainable development by financing this initiative!

BESS (Battery Energy Storage Systems)

Battery Energy Storage Systems (BESS) are devices designed to store electrical energy efficiently, using advanced technologies that allow the storage of energy produced, for example, by photovoltaic and/or renewable power plants, and release it when needed. These systems are fundamental for optimizing the distribution of renewable energy, improving the reliability and stability of energy grids, especially in contexts where production is intermittent, as in the case of solar and wind energy. BESS consist of high-capacity battery modules that can be scaled according to specific needs. The stored energy can be used to compensate for peak demand or to support electrical grids during periods of low production, ensuring a continuous and balanced supply. Furthermore, BESS systems help reduce the need for fossil fuel plants, thereby cutting CO2 emissions and facilitating the transition to a sustainable energy mix. From a financial perspective, BESS offer significant advantages as they allow for the maximization of the use of generated energy, the reduction of operational costs, and the optimization of energy flow management. In many jurisdictions, the installation of storage systems is incentivized thanks to support policies that promote the adoption of innovative and sustainable energy solutions. Estimates indicate rapid growth for BESS systems in the coming years. In 2022, the global market recorded an installed storage capacity of approximately 15 GW, with annual growth forecasts exceeding 20%, leading the total to exceed 60 GW by 2030. This development will contribute significantly to the decarbonization of global electrical grids, making the energy system more resilient, efficient, and low-impact.

Investing in BESS therefore represents a strategic choice not only to improve energy management efficiency, but also to foster a sustainable energy future, reducing dependence on fossil fuels and contributing to the fight against climate change.

WHAT ARE THE ENVIRONMENTAL BENEFITS GENERATED BY THE PROJECT?

BESS systems do not generate directly clean energy, but enhance the effectiveness of existing renewable sources and reduce reliance on fossil fuels, accelerating the energy transition.

JOIN US